The second phase of the Rio Solar Farms involves thedevelopment of a 20 MW PhotovoltaicSolar Power Plant, targeting a CO2 emissions reduction of 160,000 tons annually.
Installed capacity: 20 MW
Estimated CAPEX: 130 mn BRL
CO2 emissions reduction: 160,000 tons/year
Electricity rate saving: 20% discount minimum
Status: Ongoing studies